and so the total purple statification begins!
here is the first proofing body I'm running on the CNC - a 5-string lefty with a single P pickup
so far today I have validated my tool paths for the alignment pin holes, neck pocket, pickup cavity, top routed control cavity, body perimeter, and the first roughing pass of the forearm contour. this image shows a ball mill loaded into the router in advance of its second attempt at its proofing pass (the first attempt revealed that I had the feed rate waaaay too slow, so I'm taking a break to get it bumped up to a more realistic feed speed. it's getting late, so testing the new code will probably have to wait until tomorrow
what a stinkin' static mess all those purple foam pieces are

they won't sweep away, so I have to use compressed air to blow them away ... only for them to find a new home stuck to something else >:|
all the best,
R